
The Transport Department issued multiple special traffic bulletins on 24 November as strong northeasterly winds swept the Pearl River Delta. Motorists on the Hong Kong–Zhuhai–Macao Bridge (HZMB) Hong Kong Link Road saw the speed limit slashed from 100 km/h to 50 km/h, while cross-boundary shuttle-bus operators warned of possible delays. Ferry services between Ma Wan and Central/Tsuen Wan were also partially replaced by emergency bus routes. Rail passengers are affected too. Mainland railway authorities informed Hong Kong that, from 24 November to 27 December, dozens of Guangzhou-Shenzhen-Hong Kong high-speed trains will skip Humen Station because of scheduling adjustments linked to line upgrades. Tickets to and from Humen on the affected services have been suspended, and travellers must re-route via Guangzhou South or Shenzhen North. For business travellers and cross-border commuters, the compounded disruptions could lengthen journeys between Hong Kong, Shenzhen and the western Pearl River manufacturing hubs just as year-end factory visits and MICE events ramp up. Corporate mobility teams should brief travellers to allow additional transit time, monitor HKeMobility and 12306 updates, and consider alternative crossings such as Lo Wu or the Shenzhen–Hong Kong Western Corridor when weather worsens. The incident is a reminder that the HZMB, though a strategic 24-km artery for the Greater Bay Area, is vulnerable to seasonal wind restrictions. Companies with time-critical supply-chain movements across the bridge should build weather contingencies into logistics planning, particularly during the winter monsoon season.