
Transport for London (TfL) has confirmed a complete suspension of the Heathrow Express and Elizabeth Line between all Heathrow terminals and central London from Saturday 28 to Sunday 29 November 2026 due to major engineering works. The closure also shuts London Paddington station, eliminating the usual high-speed rail link favoured by business travellers. During the outage, TfL advises passengers to use the Piccadilly Line, which will operate normally but is slower and more crowded, or book licensed airport taxis. Replacement buses will connect key Elizabeth Line stations west of London, but journey times to the airport could exceed 90 minutes—double the usual rail time. Travellers with early-morning flights are urged to leave extra time and check in online wherever possible. Airlines operating from Heathrow have issued their own alerts. British Airways is waiving same-day change fees for domestic connections, while several Gulf carriers recommend arriving at least four hours before departure. Cargo forwarders have also been told to anticipate knock-on delays at air-freight sheds as staff struggle to reach the airport. The works form part of Network Rail’s long-planned signalling upgrade between Old Oak Common and Paddington ahead of HS2 integration. Although scheduled over a traditionally quieter November weekend, the shutdown coincides with the start of peak corporate travel to Asia-Pacific ahead of year-end board meetings. Practical takeaway: global mobility teams should update travel policies to authorise additional ground-transport costs and notify assignees arriving or departing this weekend. For high-value shipments, consider re-routing through Gatwick or Birmingham to avoid time-critical delivery risks.
Source: Transport for London status page