
Swiss Federal Railways announced on 18 November that the Biel–Grenchen stretch of the Jura south-foot corridor will be completely shut over the weekend of 28–29 November to stabilise an embankment that sank during this summer’s drought. Long-distance trains will be diverted via Neuchâtel, adding up to 30 minutes, while regional services will terminate early with replacement buses running every 15 minutes. The line handles around 330 passenger and freight movements per day, including the Basel–Geneva InterRegio. SBB engineers detected continuing settlement despite speed reductions introduced in October; closing the track allows continuous tamping and soil-injection work expected to restore full load-bearing capacity. Corporate travel managers with staff commuting from French cross-border regions should alert travellers to check real-time schedules. The closure overlaps with end-of-month business trips and could cascade into missed flights at Basel EuroAirport for passengers relying on rail connections. Freight forwarders moving time-sensitive goods such as pharmaceuticals out of the Basel cluster are advised to switch to overnight lorry routes or book slots on the Lötschberg axis. After the intensive repair weekend, speed limits will remain until geotechnical sensors confirm stability; therefore, minor residual delays are likely into early December.
Source: SWI swissinfo.ch